Last update: —
Pump Room
Tower Level
—
ft
Clearwell Level
—
ft
Raw Flow
—
gpm
Finished NTU
—
NTU
Finished CL2
—
mg/L
PLC Running
—
HSP1 Running
—
HSP1 Fault
—
Lake Pump Running
—
BW Pump Running
—
BW Pump Fault
—
HMI Block Pump
—
BW Pump On
—
Filter Building — F1 & F2
Filters Running
—
Power Status
—
BW Flow
—
gpm
BW Flow Final
—
gpm
Filter 1
Level
—
in
Loss of Head
—
in
Effluent NTU
—
NTU
Effluent Actual
—
Filter 2
Level
—
in
Loss of Head
—
in
Effluent NTU
—
NTU
Effluent Actual
—
Filter Building — F3 & F4
Filter 3
Level
—
in
Loss of Head
—
in
Effluent NTU
—
NTU
Effluent Actual
—
Filter 4
Level
—
in
Loss of Head
—
in
Effluent NTU
—
NTU
Effluent Actual
—
—
Tower & Clearwell Levels (ft) — Dual Axis
Raw Flow (gpm)
Finished NTU & CL2
Pump Status (HSP1 & Lake Pump)
Filter 3 & 4 Trends
F3 & F4 — Effluent NTU
F3 & F4 — Effluent Flow (GPM)
F3 & F4 — Filter Level (in)
F3 & F4 — Loss of Head (in)
Filter 1 & 2 Trends
F1 & F2 — Effluent NTU
F1 & F2 — Effluent Flow (GPM)
F1 & F2 — Filter Level (in)
F1 & F2 — Loss of Head (in)
Analog Alarm Limits
| Tag | Description | Enabled | Lo Lo | Lo | Hi | Hi Hi | Units |
|---|
Digital Alarms
| Tag | Description | Enabled | Delay (min) | Notes |
|---|
✓ Saved
Alarm Callout List
Called in order
✓ Saved
Recent Alarms
—
| Time (Central) | Event | Alarm | Description | Detail |
|---|---|---|---|---|
| Loading... | ||||
Valve Status
—
OPEN open switch made
CLOSED closed switch made
TRAVEL mid-stroke, or a failed switch if it persists
FAULT both switches made — check wiring
Plant Notes
—
0 / 2000
Ask Hope
Ask about live plant status, stored history, or general water treatment questions.
Live answers come from the Copan database. Reference answers come from Oklahoma DEQ
operator material and are cited as such.